Studies to evaluate the reliability and safety of an electrical installation. These studies are usually offered together as they depend on each other.
In order to perform the Arc flash study, it is necessary to have previously performed the short circuit study. In turn, for the coordination of protections it is necessary to know the short circuit level.
We perform three-phase fault simulations, line to ground fault, line to line fault and line to line to ground fault. This allows us to know the short circuit currents at each point of the system, for half-cycle and 5-cycle asymmetrical currents, as well as initial and steady-state symmetrical currents.
See moreWhen starting an installation it is necessary to perform a short-circuit evaluation to know the capacities of the equipment to be installed. In addition to determine the fuses and thermomagnetic switches required for proper operation.
See moreThis risk assessment analysis complements the scopes of the Protection Coordination Study. It evaluates the conditions of the power plant according to NFPA 70E-2018 standards.