Arc Flash Study

This risk assessment analysis complements the scopes of the Protection Coordination Study. It evaluates the conditions of the power plant in accordance with NFPA 70E-2018.

In order to perform the Arc flash study, it is necessary to have previously performed the short circuit study. In turn, for the coordination of protections it is necessary to know the short circuit level.

Short circuit study

We perform three-phase fault simulations, line to ground fault, line to line fault and line to line to ground fault. This allows us to know the short circuit currents at each point of the system, for half-cycle and 5-cycle asymmetrical currents, as well as initial and steady-state symmetrical currents.

See more
short-circuit-study

Protection coordination study

When starting an installation it is necessary to perform a short-circuit evaluation to know the capacities of the equipment to be installed. In addition to determine the fuses and thermomagnetic switches required for proper operation.

See more
production-coordination-study

Arc Flash Study

This risk assessment analysis complements the scopes of the Protection Coordination Study. It evaluates the conditions of the power plant according to NFPA 70E-2018 standards.

See more
arc-flash-study

What does this study do?

This study includes indications of the arcing characteristics produced by a fault in the highest incident energy operating condition for all buses in the plant.

These characteristics include:

Arc-Flash boundary results: distance to be maintained according to the level of personnel training and protective equipment.

Incident energy results: Results obtained through the software of the level of energy that could be released in case of an event.

Personal protective equipment according to incident energy levels.

Benefits

  • Determine the optimal safety distances, type of clothing and protective equipment for your personnel.
  • Avoid injury or death of employees due to arc faults.
  • Reduce possible damage to your equipment or facilities.
  • Decrease system downtime to the minimum possible.
  • Complies with safety regulations, current standards and insurance.
  • Avoid expenses due to labor lawsuits.
  • We perform the evaluation according to the criteria of the Network Code.
  • Avoid CENACE fines by being in compliance.
  • If you need energy saving equipment to comply with regulatory requirements, we provide it.
  • We provide recommendations and best practices to maintain optimal operation.
  • By performing these studies we gather valuable information about your operation to support you quickly in case of any unforeseen future events.