Success Stories

Ford Cuautitlán

The STATCOM met the dynamic demand for reactive power generated by the load center's operation, maintaining a power factor (PF) of 0.97 95% of the time.

APEXLLL Crown Veracruz

The STATCOM met the dynamic reactive power demand required for the operation of the load center.